It is our duty that after that we destroy this (our) planet to think. Thinking don’t hurt. We need to learn from the past errors! It is in our DNA to make errors and after that learn.
Let’s do some math…
Theory… An ERSA garbage… http://kurtzersa.com.cn/electronics-production-equipment/soldering-machines/reflow-soldering/produkt-details/exos-1026.html
Only we speak about power… – Nominal power: 118-150 kW (in the world exist garbage like that with much more power).
So…
150Kw/h – Attention! Let extrapolate this for… 1000 (a minimum 1000 pcs. Exist in the world, I think that exist more from ERSA + another garbage manufacturers).
So…
150Kw/h X 1000=150,000Kw/h to manufacture electronic boards about 1 m/1 m (1 meter X 1 meter).
So…
150,000 = 150Mw/h consumed energy…
If… I can tell you that by selective soldering same board dimensions is needed about 1Kw/h… (Technologies already exist for more than 20 year) but… are not used.
So…
1Kw X 1000=1000Kw
150,000/1000=150 – times minus consumed energy!!!
Next…
With the “well-known garbage (ERSA… like…)” a board can be reflowed in about 3-5minute…
So…
With selective soldering method, the same board can be soldered in about 10 to 20 seconds!
Math…
5minute / 20 second = 15 times less or… 15 boards in same time that ERSA garbage reflow 1 !!!
So…
150 times minus energy & 15 times faster… What / where / who is the problem?!
What / where / who?!
Well… the answer is because we’re leaving in a cardboard engendering world! They have amputated brain! When the aliens amputate his brain… give at all… IPC Certificates! They can’t… think. This specie of energumens / engineers think that thinking hurt!
I don’t speak about inutile space consumed, about inutile weight, about inutile logistic, about inutile human resource and more…
And… Here I’ll don’t speak about… BGA Rework Stations…
So…
On this website you will see how is born… Next generations of electronic assembly lines…